24/7 紧急调度 (909) 506-1979

ADU & New Construction Plumbing

🏗️ ADU Plumbing Subcontracting · C-36 Licensed Contractor

ADU New-Construction Plumbing
One Subcontractor, Start to Finish

From underground rough-in to final trim — with self-pulled sub-permits and a formal bid in 48 hours. The ADU plumbing subcontractor GCs and owners choose first.

🏆 CA C-36 License on File 📋 Self-Pulled Sub-Permits ⏱️ Formal Bid in 48 Hours 📄 COI · W-9 · Lien Waivers Ready ✅ AHJ Inspection Support

Full-Process ADU Plumbing

Garage conversion, detached new build, or JADU — SecurePipe handles every phase of ADU plumbing. One subcontractor, no second-tier subs, fully accountable.

⛏️

Underground Rough-In

  • Below-slab drain, waste & vent layout
  • Water-supply stub-outs and embeds
  • Cleanout and inspection-port installation
  • Slope calculation & CPC compliance verification
  • Tie-in to city sewer / septic
🔧

Interior Rough-In

  • In-wall water supply (copper / PEX)
  • Drain, waste & vent assembly
  • Top-plate penetrations & roof vent caps
  • Stub-outs for bath, kitchen & laundry
  • Water-heater supply & recirculation pre-pipe
🪛

Finish / Trim Phase

  • Toilet, sink & shower installation
  • Sink, dishwasher & refrigerator hookups
  • Washing-machine connection completion
  • Final water-heater install & commissioning
  • Exterior hose bibs & utility terminations
🔥

Gas Piping

  • Gas-main extension & branch routing
  • Water-heater, range & dryer gas hookups
  • Pressure testing & AHJ inspection
  • Coordination with the gas utility for connection
  • Meets California Title 24 energy requirements
📋

Permit Filing

  • C-36 license holder self-pulls the sub-permit
  • Prepare as-builts / plumbing plans
  • Communicate with the AHJ on the owner’s behalf
  • Coordinate both rough and finish inspections
  • Hand over documents once inspections pass
🤝

GC Document Package

  • Certificate of Insurance (COI) available on request
  • W-9 form · lien waivers
  • Written fixed-price contract
  • As-built records & inspection reports
  • Warranty documentation

ADU Plumbing in Five Steps

From first call to a passed AHJ inspection — transparent the whole way, no surprises.

1

On-Site Assessment

Free on-site or remote assessment to confirm scope and city tie-in conditions.

2

48-Hour Bid

A written fixed-price bid, itemized and clear, with no hidden fees.

3

Pull the Permit

Our C-36 license holder self-pulls the sub-permit and prepares as-built drawings.

4

Rough-In + Trim

Completed in phases on the build schedule, working to the GC’s timeline.

5

AHJ Inspection

We coordinate the building department’s on-site inspection to pass the first time.

Not Just a Subcontractor
The Plumbing Expert on Your Jobsite

The Inland Empire ADU boom has brought a flood of low-quality subs. SecurePipe lets its license, compliance, and paperwork do the talking.

📋

C-36 Licensed — No Gray-Area Work

The license holder works the job directly and legally self-pulls every permit required — never riding on the GC’s license.

💰

Fixed Price — No Mid-Job Upcharges

The written bid is the final price — no “we found something” surprise add-ons, so the GC keeps budget control.

Fast Response — No Schedule Drag

Formal bid in 48 hours, matched to the GC’s schedule — never the bottleneck.

🗣️

Fluent Mandarin & English

Owners deal with us directly — no interpreter, fewer miscommunications, faster decisions.

SecurePipe vs. a Typical Subcontractor

❌ Typical Subcontractor
No license, rides on the GC
✓ SecurePipe
Holds its own C-36 license
❌ Typical Subcontractor
Verbal quote, mid-job upcharges
✓ SecurePipe
Written fixed-price contract
❌ Typical Subcontractor
GC has to pull the permit
✓ SecurePipe
Self-pulls the sub-permit
❌ Typical Subcontractor
Incomplete paperwork delays closeout
✓ SecurePipe
COI · W-9 · lien waivers all ready

Build to Code

A Permit for ADU Plumbing Isn’t Optional

California law requires every ADU plumbing job to be done under a valid license with the proper permit. Unpermitted work can block the sale of the home, get a homeowner’s fire-insurance claim denied, and multiply future remodel costs. We hold a C-36 license, pull the permit before work, and support you through AHJ inspection afterward.

We support AHJ inspections in these jurisdictions:

Rancho Cucamonga Building Dept.
Chino Hills Building Dept.
Chino Building Dept.
Ontario Building Dept.
Upland Building Dept.
Fontana Building Dept.
Pomona Building Dept.
& surrounding cities

Get Started

ADU project moving forward?
Get a formal bid within 48 hours

Tell us the project address, ADU type, and build phase — we respond fast and keep plumbing off your critical path.

C-36 Licensed Sub 48-Hour Bid Self-Pulls Permits Fully Insured
📞 (909) 506-1979 Send Inquiry
Real Reviews

What Owners Say

Real Google reviews · Greater LA & the Inland Empire

★★★★★

“From permit to passing AHJ inspection, SecurePipe handled our backyard ADU end to end. The GC said they were one of the smoothest subs he’s worked with — paperwork complete, on schedule, never needed chasing. Finished 3 days ahead of plan.”

C
Mr. Chen Rancho Cucamonga · ADU New Build
Google Review
★★★★★

“As a general contractor, I’ve worked with a lot of subs. SecurePipe is one of the few that delivers — bid in 48 hours, pulls their own permit, hands over inspection records at completion — zero hand-holding. We’ll keep using them on future ADU projects.”

R
Robert M. Ontario · General Contractor
Google Review
★★★★★

“I’d tried two other plumbers before — one had no C-36 license, the other wouldn’t pull permits. SecurePipe showed up to the first meeting with their license number, COI, and W-9 ready. The whole ADU plumbing job was professional and passed inspection the first time.”

L
Ms. Lin Chino Hills · Detached ADU
Google Review
Workmanship 1-Year Quality Guarantee

All workmanship defects are repaired free; material manufacturing defects are covered by the manufacturer’s warranty, which we help you pursue start to finish.

Our Guarantees

Our promise on every project

  • 📋
    Permit Guarantee We self-pull the building permit on every job and never work unpermitted — eliminating title disputes down the road.
  • 🏛️
    Inspection Guarantee Work is done strictly to the CPC with a high first-pass rate — if a correction is needed, we handle it free until it passes.
  • 💰
    Fixed-Price Guarantee Your price is locked at signing — no hidden fees, no mid-job upcharges, unless you change the scope yourself.
  • 🛡️
    Insurance Guarantee General liability + workers’ comp in force throughout, COI available anytime — protecting owner and GC from jobsite risk.
  • 🔧
    Workmanship Guarantee 1-year workmanship guarantee, with brand-name materials that meet ASTM / ASSE standards — no cutting corners.
In-Depth Answers

ADU Plumbing · Detailed FAQ

Q1
Does an ADU need its own water and gas meters?
It depends on local city requirements. Some cities (like Chino Hills and Ontario) allow the ADU to share one water meter with the main house using a submeter; others require a separate service. We confirm with the AHJ and water authority before work and write the approach into the contract —so owners never face surprise costs after completion.
Q2
If the ADU is a garage conversion, what’s different about the plumbing?
A garage-conversion ADU usually has no existing drain stack, so new floor drains and vents must be added — generally more involved and costlier than a detached ADU. At the on-site assessment we check the existing slab, drainage direction, and distance to the main house, then give a precise bid —never a low-ball quote followed by mid-job add-ons.
Q3
Can I still live in the main house during construction?
In almost all cases, yes. The underground rough-in may require a brief (2–4 hour) water shutoff to the main house, scheduled with 24 hours’ notice. The interior rough-in and finish phases usually don’t affect normal use of the main house.We actively coordinate timing to minimize disruption to your daily life.
Q4
Can solar or tankless water heaters be used with the ADU?
Yes. We handle gas and hot/cold connections for tankless water heaters and recirculation lines for solar hot-water systems. We recommend confirming the heater brand and model at the design stage so we can rough-in the right pipe size and location,avoiding rework at the finish stage.
Q5
After the ADU plumbing is done, how do I rent it out? What inspections are required?
After the AHJ final inspection passes, we provideas-built drawings and the signed-off inspection card, the documents you need for a rental permit and to transfer title. Some cities also require a filing with the rental-housing department, and we can supply the supporting paperwork.
Q6
What’s included in the bid? Are there hidden fees?
Our bid itemizes everything:materials, labor, permit-application fees, inspection fees, and pressure-test fees— all included in the fixed price. The usual “extra cost” cases are when the owner changes the floor plan mid-project, or an architect’s drawing change forces a piping re-design. In those cases we confirm the price difference in writing after the change order and before doing the work,never doing the work first and billing later without your approval.
Q7
Do you do JADUs (junior accessory dwelling units)? Are they different from a standard ADU?
Yes. A JADU is usually carved out inside the main house, no larger than 500 sq ft, and the plumbing is relatively simple — mainly branching independent bath and kitchen connections off the main house.A JADU bid is typically 30–50% lower than a detached ADU, but the permit requirements are just as strict, and we pull them the whole way.
Q8
Which cities do you serve? Do projects need to be scheduled in advance?
Our service area coversGreater LA & the Inland Empire, including Chino Hills, Chino, Ontario, Rancho Cucamonga, Fontana, Pomona, Diamond Bar, Walnut, Upland, Claremont, and surrounding cities. Current scheduling is about 2–3 weeks out, so we recommendcontacting us at the same time you file the building permit, which meaningfully cuts your wait time.
Timeline Reference

ADU Plumbing · Timeline by Phase

Based on a standard 400–600 sq ft detached ADU; actual timelines vary with project complexity and AHJ scheduling.

Phase 1
📐

On-site assessment & bid

Measure pipe routing, confirm tie-in points, assess soil and slab conditions, check local code requirements

1–2 days
Phase 2
📋

Permit Filing

Submit plumbing plans to the Building Department and respond to plan check (some cities offer expedited review)

1–4 weeks
Phase 3
🏗️

Underground rough-in

Excavate; lay the main drain, supply, and gas mains; complete underground connections and backfill

2–4 days
Phase 4
🔩

Interior rough-in

Install interior supply/drain mains, vents, and water-heater connections, then pass the rough-in inspection

3–5 days
Phase 5

Finish & final inspection

Set fixtures, faucets, and the water heater; run the pressure test; pass the AHJ final inspection; deliver as-builts

2–3 days